high-strength-mgo-roofing-sheet “Hocreboard”magnesium oxide roofing tiles are using magnesium oxide, magnesium chloride, talcum powder and other inorganics as raw materials, glass fiber mesh cloth as skeleton. It features fire-proof, heat-insulation, corrosion-resistant, acid& alkali resistant, anti-aging, high strength, shock resistant, long service life, etc.

The MgO roofing tiles could be processed by saw, nails, drilling, Installation is simple and quickly, saving material and labor cost.

 

Specification:

Wave Profile     Big Wave Medium Wave Small Wave
Length1000 mm -7000mm1000 mm -7000 mm1000 mm -7000 mm
Width960 mm800mm,960 mm 860 mm
Thickness5mm±0.5mm5mm±0.5mm5mm±0.5mm
Wave Height 51 mm33mm35mm
Wave Number4.57,7.55
Wave Distance180mm133mm60mm
Weight/Meter9-11kg9-11kg9-11mm

Type:
湖北11选5 -Pet Film Coated Mgo Roofing sheet

-Aluminium Foil Mgo Roofing Sheet

湖北11选5-Anti Oxidation Film Mgo Roofing Sheet

-Mgo Glazed roofing tiles

Main Technical Parameters:

ItemParameters of MgO Sheet
Horizontal Flexural Strength>4900N/M
Vertical Flexural Strength>320N/M
Impact ResistanceNo crack, flake, through hole
Hygroscopicity<14%
ImperviousnessNo spot or dropping
Frost ResistanceNo crinkle
Heat Conductivity0.1839W/M.K
Grade of PulverizationNo pulverization
Grade of Discolouration0
Colour Aberration<0.66

Main Features:

1.Water resistance
2 .Cold Resistance
3.Pressure Resistance
4 .Never Fade
5. Easy to be constructed
6. Sound Insulation
7. Heat Insulation
8. Smooth and Clean Glaze
9. Multiple Colors
10. Corrosion Resistance

Applications:

This product can be widely used for factories, warehouses, garage,shopping centres, residential quarters and villas,feeding-house of all kinds. Especially suitable for corrosive workshop, high-temperature chemical plant, or with other special requirements such as sound insulation and temperature preservation.  It also can be used as the roofing tiles or outer wall of temporary building.

Installation instructions:

(1). As the area of the sheet is big, please don’t install in strong wind weather.
(2). To ensure the safty of construction work, temporary sidewalk shall be set up when     working on top of the building roof, and on the ground, safty sign shall be put.
(3). Installation worker shall wear clean, soft rubber shoes, it is strictly prohibited to   stand on the sheet without the support from under purline.
(4). Not any heavy item or hard iterm, such as iron wire, place on the sheet, shall not use the surface of the sheet as operating platform.
(5). When installing, shall drilling the hole by electric drill, and cut by electric serration saw, it is prohibited to use steel nail to dril the hole.